Project Description
The proposal has undergone significant changes since the initial concepts were outlined. These changes have included a reduction in the scale of the development (from 32 to 13 turbines) and in the size of the individual turbines (from 100m to 91m).
Changes to Wind Farm Footprint.

Turbine Comparison Showing Reduced Scale

The current proposal consists of thirteen 1.5MW turbines giving an overall installed capacity of 19.5MW. The turbines will be around 55m in hub height with a rotor diameter of approximately 70m giving a maximum tip height not exceeding 91m.
Each turbine requires an access track for erection and service and a craneage area suitable for deploying the large crane necessary during assembly.
The proposal will also include a small control building to house essential electrical equipment enabling the wind farm to be connected to the electrical grid, and a wind monitoring mast. The monitoring mast enables the performance of the wind turbines to be monitored during operation.
The closest suitable grid connection is likely to be by underground cable to the Thurso substation some 6km to the northwest.