Gortgall Wind Farm
County Fermanagh

Gortgall Wind Farm, lies within the townland of Gortgall in the parish of Boho in County Fermanagh. The site is centred on Ordnance Survey Grid Reference : H137000 Easting 420000 Northing and lies approximately 10km west of Enniskillen and 8km northeast of Belcoo.

 

The site is surrounded by commercial forestry to the north, and west and covers just over 1km2 in area. The land use of the site reflects a significant degree of human activity. The predominant land use activity within the proposed development site is the grazing of animals although there is significant evidence of historic and recent turf cutting land use activity.


Layouts
The proposed wind farm will consist of 9 three bladed, horizontal axis, upwind turbines with a rotor diameter of nominally 84m, and a hub height of around 70m. The maximum ground to tip height will not exceed 112m. These machines will have a nominal generator rating of 2-2.5MW resulting in an overall site installed capacity of between 18 and 22.5MW.

 

 

Environmental Impact
A full Environmental Impact Assessment (EIA) has been undertaken which has included Landscape and Visual, Ecological, Archaeological, Hydrology, Geology and Noise Assessments for the wind farm. The assessments have been compiled into an Environmental Statement (ES) which was submitted accompanying a planning application for the wind farm in March 2006

A non technical summary for the wind farm is available on request.
View from Belcoo
View from Boho
View from Enniskillen

Turbine

 

Manufacturer and Model

TBC

Nameplate Rating

2000-2500 kW

Hub Height (Approximate)

70 m

Rotor Diameter (Approximate)

84 m

 

 

Site

 

Number of Machines

8

Total Installed Capacity

16 - 20 MW

Annual Output

58 GWh

Equivalent Tonnage of CO2 Saved*

50,500

Equivalent Number of Households

12,500

 

 

Power Contract

TBC

Commission Date (Scheduled)

TBC