Cappawhite Wind Farm
County Tipperary
The site is situated at the southern most extent of the mountain range known as the Hollyford Hills in Tipperary South Riding. It has a mean site elevation of around 300m and an average hub height wind speed of 7.5metres/second. It lies immediately north of Cappawhite village and approximately 17 km north of Tipperary town. The land use is primarily grazing for cattle with some small elements of forestry.
Site Photo

The Cappawhite wind farm was originally granted planning permission in 2001 based on a layout of 11 turbines of between 1.5 and 1.65MW installed capacity each, however, since then it has (along with many other wind farms) been waiting for an ESB grid connection offer.

 

Site Layout

The moratorium on connection offers imposed by ESB in 2003 because of the initial concerns over how much wind energy could be accepted onto the grid has now been lifted, following detailed assessment. This resulted in the announcement of a new round of grid connection offers (so called Gate 2) and Cappawhite wind farm has now received a connection offer.

View from Cappagh White Village Centre
Since the original site design some 6 years ago, turbine technology has moved on and we have now considerably more wind data. The revised proposal replaces the original 11 machines with 8 higher energy capture machines better designed for the wind speeds on the site. The revised layout then is based on 8 turbines of up to nominally 90metre rotor diameter and 80 metre hub height and a number of candidate machines are being considered. These machines will have installed capacities of around 2.0MW each.
View from R505 East of Annacarty
The energy capture of the revised layout eight machines is predicted to be 19-26% better than the eleven turbines of the original Cappawhite design.
View from Donohill Church
An Environmental Impact Assessment has been undertaken as part of the site redesign and a revised Environmental Impact Statement (EIS) submitted in support of the application to change the layout. A non technical summary for the wind farm which summarises the contents of the full EIS is available for download.
View from Roadside House Near Toem.

Turbine

 

Manufacturer & model

TBC

Nameplate Rating

2,000KW

Hub Height

80M

Rotor Diameter

90M

 

 

Site

 

Number of Machines

8

Total Installed Capacity

16,00 MW

Annual Output

55.0 GWh

Equivalent Tonnage of CO2 Saved

47,000 

Equivalent Number of Households

11,000 

 

 

Power Contract

TBC

Commission Date (Scheduled)

TBC

 