Booltiagh 2 Wind Farm
County Clare
The proposed Booltiagh Extension (Booltiagh 2) consists of the addition of a further six turbines to the Booltiagh wind farm. The consists of a further turbine row (comprising a further three machines) to the east, and a three turbine group to the north. This will increase the overall installed capacity by 9.0 MW giving a total of 31.5MW.
View from Lough Namina
The locations of the six turbine sites have been chosen so that all machines lie within areas which are already under commercial forestry. The turbines will use the main Booltiagh wind farm infrastructure – site entrance, turbine access roads, and will connect to the existing on site substation and ESB National Grid interconnection point
View from West of Kilmihill
Booltiagh Extension Layout

Turbine

 

Manufacturer and Model

GE 1.5s

Nameplate Rating

1500kW

Hub Height

54.7 m

Rotor Diameter

70.5 m

 

 

Site

 

Number of Machines

6

Total Installed Capacity

9 MW

Annual Output

28.6 GWh

Equivalent Tonnage of CO2 Saved

25,000

Equivalent Number of Households

6,200

 

 

Power Contract

TBC

Commission Date

TBC