DP Energy Ireland Ltd


Irish Sites:
Atlantic Wind Park
Barrboy
Bessy Bell
Black Banks 1
Black Banks 2

Boolitagh 1
Booltiagh 2
Cappawhite
Carrane Hill 1
Carrane Hill 2
Corrie Mountain
Slatbeg

Booltiagh 2 Wind Farm
County Clare

 

The North and Eastern Extension (Booltiagh 2) consists of a six turbine addition to the built Booltiagh wind farm. The development consists of a further turbine row (comprising a three machines) to the east, and a three turbine group to the north. This will increase the overall installed capacity by 12.0 MW giving a total of 31.5MW.

 

 

View from Lough Namina
The locations of the six turbine sites have been chosen so that all machines lie within areas which are already under commercial forestry. The turbines will use the main Booltiagh wind farm infrastructure – site entrance, turbine access roads, and will connect to the existing on site substation and ESB National Grid interconnection point
View from West of Kilmihill
Booltiagh 2 was awarded planning permission in October 2008, and has a Gate 2 Grid Connection offer.
Booltiagh Extension Layout

Turbine

 

Manufacturer and Model

TBC

Nameplate Rating

2000kW

Hub Height

78 m

Rotor Diameter

83 m

 

 

Site

 

Number of Machines

6

Total Installed Capacity

12 MW

Annual Output

42 GWh

Equivalent Tonnage of CO2 Saved

44 , 375

Equivalent Number of Households

9000

 

 

Power Contract

TBC

Commission Date

TBC

View from Killmaley
all web content