Booltiagh 1 Wind Farm
County Clare
The Booltiagh site has a mean site elevation of 170 m and an average wind speed of 8.5metres/second. It lies approximately 15 km west of the Ennis in County Clare, mid way between the villages of Kilmalley and Kilmihil. The area is used extensively for commercial forestry and much of the turbines are sited in areas of young trees.
Booltiagh is now constructed and commissioned and is operating
under an Alternative Energy Requirement VI power contract.

Click here for construction images of the wind farm.

Turbine

 

Manufacturer and Model

GE 1.5s

Nameplate Rating

1500kW

Hub Height

54.7 m

Rotor Diameter

70.5 m

 

 

Site

 

Number of Machines

13

Total Installed Capacity

19.5 MW

Annual Output

62.0 GWh

Equivalent Tonnage of CO2 Saved

54,500

Equivalent Number of Households

13,400

 

 

Power Contract

AER VI

Commission Date

August 2005

 